
Your equipment / a professional place to run it
Server Colocation
Already own the right server? Put it to work in a data center. I help you check the equipment, power, access, and software before the move.
From a mini PC to a rack
Colocation base prices
You provide the equipment. We choose the space and power it needs, then plan the business software and access.
| Equipment / space | Size (W x H x L) | Power | IPv4 | Base rate | Plan |
|---|---|---|---|---|---|
| Mini PC | 8 x 3 x 8 in | 1A / 120V | 2 | $45.50/month | Choose |
| Mid tower | 10 x 22 x 22 in | 2A / 120V | 5 | $84.50/month | Choose |
| Full tower | 10 x 27 x 22 in | 2A / 120V | 5 | $97.50/month | Choose |
| 1U | 1U | 2A / 120V | 5 | $89.70/month | Choose |
| 2U | 2U | 2A / 120V | 5 | $102.70/month | Choose |
| 4U | 4U | 2A / 120V | 5 | $128.70/month | Choose |
| Quarter rack | 10U | 5A / 120V | 20 | $429.00/month | Choose |
| Half rack | 21U | 10A / 120V | 40 | $689.00/month | Choose |
| Full rack | 42U | 20A / 120V | 60 | $1,209.00/month | Choose |
Listed plans include 1Gbps, unmetered transfer and IPv6 /64. Rack-mounted equipment needs rails. Standard provider installation is listed without a setup fee; Dean's custom preparation, shipping and additional work are scoped separately.
Dean's starting server-service rates, updated October 15, 2026. Infrastructure arranged through Sectorlink. USD per month. Availability, licenses, upgrades, custom setup and ongoing workload management are confirmed before ordering.
Get the details right first
Check the equipment before shipping it.
Fit and power
Check the chassis size, rail kit, power draw and any extra needs. A custom GPU workstation can need more power than a standard tower plan supplies.
Remote access
Plan how you will restart, update, and reach the machine. Write down the access and physical support arrangements before the server leaves your office.
Data and recovery
Prepare a tested backup and the software needed for the actual workload. Decide what happens if a drive fails or the system needs a reinstall.
Keep the build practical
Work first. Hardware second.
- Tell me the job.
What should the server run, who uses it, and what is slowing the business down?
- Choose the resources.
Match processor, memory, storage, operating system, and any GPU to that job.
- Agree on the whole cost.
Separate the server, setup work, software, and ongoing service before the build starts.
- Build and check it.
Set up the workload, check access and backups, and test the real task before handoff.
Straight answers
Before you choose a server
Do these prices include buying a server?
No. Colocation is space, power and connectivity for equipment you own. Hardware purchases, shipping, custom setup and software are separate.
Can you help with a workstation or A.I. machine?
Yes. We first check the equipment, heat and power needs against the facility's available space. Special configurations need a confirmed quote.
Where is the equipment hosted?
Colocation is arranged through Sectorlink's data center service. Dean helps with the workload and preparation agreed in your project.